Construction Updates
Golf Residences by Prestige One
Technical Specifications
Key construction figures, materials and delivery benchmarks for Golf Residences by Prestige One.
Planned Concrete Utilization: Equivalent to 17 Olympic-sized swimming pools
Planned Glass Panel Weight: 837,000 kg (about 2.2 times the weight of a Boeing 747)
Building Structure & Built-up Area: 1 Ground, 3 Podium Levels, 19 Typical Floors + Roof; Built-up Area: 456,655 sq ft
Workforce Nationalities Represented: 15-20
Projected Building Weight: Approx. 5,950 tons (combined structural materials)
Estimated Total Man-Hours: 154,400 hours
Number of Elevators: 5 (travel a combined 74 km daily)
Estimated Electrical Cable Installation: 757 km (far beyond Dubai to Abu Dhabi)
Projected Brickwork Area: 38,000 m2 (if stacked vertically, would reach 474 km high)
Construction Start Date: 16 January 2025
Estimated Rebar Length: 4,900 km (enough to span the UAE multiple times)
Rooftop Track Distance (Upon Completion): 51 laps = one full marathon
Planned Landscaped Area: 605 m2 (equal to three mini forests of 200 m2 each)
Construction Gallery
Our Construction Work Process
Track how each construction stage progresses from planning to final handover.
Planning & Consultation
We align timelines, budget strategy, design intent and construction priorities with all stakeholders before on-site execution begins.
Design & Engineering
Architectural and engineering teams coordinate layouts, systems and technical details to ensure buildability, safety and performance.
Construction Execution
Core structure, MEP systems and finishes are delivered through controlled site management, quality checks and milestone-based reporting.
Inspection & Handover
Final inspections, compliance reviews and snag resolution are completed before handover, ensuring each home is ready to occupy.